    Development of South Pars gas phases

    مدیریت سامانه
    1 تیر 1400
    916بازدید
    • customer
      :

      south pars

    • project manager
      :

      south pars manager

    • Executive project
      :

      Development of South Pars phases

    • start date
      :

      1394/11/30

    • project budget
      :

      100,000,000 tomen

    • end date
      :

      1396/12/30

    The contract for the development of phases 15 and 16 of South Pars has been concluded between Aria Naft Shahab Company as the employer and a consortium consisting of Mapna. The goal of the final development of phases 15 and 16 of South Pars is to produce 50 million cubic meters of natural gas per day, 80,000 barrels of gas condensate, 400 tons of sulfur, and more than one million tons of liquefied natural gas and one million tons of ethane per year to feed petrochemicals. Mapna’s scope of work in this project includes the construction of utility and processing units, which includes the following:

    Unit (120): Production and distribution of refinery electricity
    Unit (121): Production and distribution of steam
    Unit (122): Fuel system
    Unit (123): Production of compressed air
    Unit (124): Nitrogen production
    Unit (125): Sea water storage
    Unit (126): Seawater desalination
    Unit (127): Damin water production
    Unit (128): Production of drinking water
    Unit (129): Collection and treatment of wastewater
    Unit (130): Fire water supply
    Unit (131): Fuel and emergency power supply
    Unit (132): Cooling water

    In this case, it can be hoped that all the difficulties in presenting solutions and difficult typing conditions will end and the required time, including typing the main achievements and answering the continuous questions of the existing world of design, will be used basically.

    The contract for the development of phases 15 and 16 of South Pars has been concluded between Aria Naft Shahab Company as the employer and a consortium consisting of Mapna. The goal of the final development of Phases 15 and 16 of South Pars is to produce 50 million cubic meters of natural gas per day, 80,000 barrels of gas condensate, 400 tons of sulfur, and more than one million tons of liquefied natural gas and one million tons of ethane per year to feed petrochemicals. Mapna’s scope of work in this project includes the construction of utility and processing units

    دسته بندی:

    south Pars

    دیدگاهتان را بنویسید

    پروژه های مرتبط

    Related Projects



    با ما در ارتباط باشید...

    آدرس:

    خراسان رضوی - کیلومتر ۴۵ جاده فریمان مشهد - شهرک صنعتی کاویان - فاز یک - صنعت ۳ پلاک ۱

    تلفن های کارخانه :

    ۰۵۱-۳۴۶۹۳۶۱۴‌-‌۸
    ۰۵۱-۳۴۶۹۳۵۷۷‌-‌۹

    فکس :

    ۰۵۱‌-‌۳۴۶۹۳۵۸۰

    © تمامی حقوق مادی و معنوی این وبسایت متعلق
    به شرکت نیان باتری خاوران می باشد.